Construction of a 1200m2 waste water treatment facility for the storage, separation and re-use of acid based waste product from the car painting process.

The facility houses 20 stainless steel waste storage silos and an intricate hydraulic separation system. The entire facility including all internal surfaces, structures and services have been fabricated and treated to resist acid attack in a completely submersed environment. The structure provided a 500m2 ‘Deltacore” mezzanine floor, 18m above ground level for the housing of major plant and equipment.